Asbestos planning for Arlington homes
Arlington incorporated in 1903 as a mill town where shingle and saw mills were the main employers. The Old Town neighborhoods around downtown date from that period, while most of the city’s growth came later: the population rose roughly 450 percent from the 1980s to about 15,000 by 2007. ACS 2024 five-year estimates put about 22 percent of homes before 1980 and about 4 percent before 1940, a higher pre-war share than the roughly 2 percent the 2024 one-year ACS estimates for Marysville.
Old Town houses
A century-old house has usually been remodeled several times. Plaster, flooring, siding and heating materials from different decades can sit side by side, so a survey that follows the planned work closely is more useful than a guess based on the build year. EPA’s list of places asbestos may be found includes textured paints and patching compounds on walls and ceilings, which are easy to overlook in a house repaired many times over.
Smokey Point and newer neighborhoods
Arlington annexed Smokey Point in 1999 after a court dispute with Marysville, and the two cities still meet there. Permits follow whichever city the parcel is actually in, so check the jurisdiction before applying, especially for demolition.
City permits
We have not reviewed Arlington’s permit checklist for asbestos requirements. Ask the city whether your demolition or remodel permit needs an asbestos survey attached. PSCAA’s survey and notice rules apply regardless.
Survey, notice and disposal steps
The usual sequence in Arlington runs from survey to notice to removal to disposal. Sample the materials in the work area, or the entire structure for a demolition. File a PSCAA notice for friable removal of 10 linear feet or 48 square feet or more in a year, and for any demolition of a structure with more than 120 square feet of roof, which then waits 10 days.
Friable waste needs a shipment record and must reach an authorized site within 10 days. No facility in Snohomish County qualifies, so plan for Republic Services in Seattle or Kitsap County’s Olympic View station, which PSCAA lists as accepting waste from all counties.
Tearing down or replacing an older Arlington house
A teardown starts with a survey of the whole structure by an AHERA inspector, not just the rooms you would have remodeled, and it should include any garage, shed or barn coming down with it. Owner-occupants do not get the self-survey option for demolition. Check at the same time whether Arlington’s demolition permit asks for that survey.
All friable asbestos has to be removed before the building is knocked down. PSCAA allows intact nonfriable material, such as vinyl tile or the asbestos roofing its guidance lists as nonfriable, to stay in place during demolition as long as it remains nonfriable, after which it goes promptly into containers labeled as nonfriable asbestos waste.
The demolition notice applies to any structure with more than 120 square feet of roof, with or without asbestos, and the wrecking can begin only after the 10-day waiting period. Keep printouts of the notice and the survey on site until the lot is cleared.
Frequently asked questions
Is an asbestos survey required to demolish an old Arlington garage?
Yes. Every demolition under PSCAA starts with an accredited inspector looking at the whole structure, and a garage whose roof footprint passes 120 square feet adds a filed notice and ten days of waiting, clean result or not.
Does Arlington have an asbestos drop-off?
No. PSCAA lists no landfill or transfer station in Snohomish County that is authorized to accept asbestos waste, so it has to go to an out-of-county facility that takes it.
Can renters remove asbestos?
No. PSCAA requires renters, landlords and condo owners to hire a certified asbestos abatement contractor. Only an owner who lives in a single-family house may do the removal themselves.
Can I survey my own Old Town house before renovating it?
If you own it, live in it and are renovating rather than demolishing, PSCAA allows a self-survey. In a house with a century of layered repairs, an accredited inspector’s survey can still be worth it, because it covers materials that are easy to miss.
Does an old barn or shed on an Arlington property need a survey before it comes down?
If its roof covers more than 120 square feet, yes: PSCAA treats it like any other structure, with an AHERA inspector’s survey, a demolition notice and a 10-day wait. A smaller shed skips the demolition notice, but PSCAA’s survey rule covers any demolition, so the survey still comes first.
Lakeshore cabins and commuter subdivisions get their own treatment on our asbestos removal in Lake Stevens page, while Marysville Asbestos Removal, between the two towns, gathers every service.