Asbestos Removal in Arlington, Washington

An Arlington asbestos job runs from the first sample to the final cleanup, with testing first and removal after. The material might be ceiling texture, old tile or sheet vinyl, cement shingles, duct wrap, attic fill or the inside of a manufactured home. What your project disturbs decides which survey covers it and which notices and disposal route follow.

Arlington is a short drive north across Smokey Point, and it falls under the same Puget Sound Clean Air Agency rules as Marysville. Its core is older than Marysville’s, with Old Town streets dating to the early 1900s, so tear-downs and whole-house renovations need careful planning.

Describe your Arlington project
Older wood-sided house behind a chain-link fence, prepared for demolition, with a plastic-lined dumpster, wet gravel and fir trees under an overcast sky

Asbestos removal services

Asbestos testing and remodel abatement

Before anyone opens walls in an Arlington home, we sample the plaster, joint compound, flooring and ceiling layers in the work area. If you own and live in the house, PSCAA lets you do the survey yourself; anything else needs an AHERA inspector. From the results we build the removal plan. See testing and remodel abatement.

Popcorn ceiling removal

Sprayed ceilings can turn up in Arlington’s 1980s and 1990s subdivisions as well as its older houses. A lab result decides the method. If positive texture covers 48 square feet or more, PSCAA needs a notice. For when sealing is reasonable instead, see popcorn ceiling removal.

Floor tile and sheet vinyl

Old Town kitchens may have tile under linoleum under sheet vinyl. Intact tile and mastic are nonfriable, and paper-backed sheet vinyl is friable, so the order of removal matters. See floor tile and sheet vinyl removal for how we handle each.

Mobile home asbestos removal

For manufactured homes around Arlington, we sample ceiling panels, flooring and roof coatings before repairs. Pulling a unit with more than 120 square feet of roof off a lot counts as demolition, which brings a survey and a notice. For the details, see mobile home asbestos removal.

Siding and roofing

Cement asbestos-board siding can turn up on early houses and old outbuildings. It counts as friable, so we wet it and take it down intact. Roofing is treated differently; see siding and roofing removal.

Duct and attic insulation

Replacing an old furnace or adding attic insulation can disturb wrapped duct seams or vermiculite fill, and vermiculite should be treated as if it contains asbestos. We get that done before the HVAC or insulation crew starts. More on duct and attic insulation removal.

Arlington’s housing and asbestos

Arlington began as a mill town in 1903, and the Old Town neighborhoods around downtown date from then. Most of the city grew later, especially from the 1980s on, so a house here can be a century old or only a few decades old. A little over a fifth of its homes were built before 1980.

Old Town houses

A century-old house has usually been remodeled several times. Plaster, flooring, siding and heating materials from different decades can sit side by side, so a survey that follows the planned work closely beats a guess from the build year. Textured paints and patching compounds on walls and ceilings can contain asbestos and are easy to overlook in a house repaired many times over.

Smokey Point and newer neighborhoods

Arlington annexed Smokey Point in 1999 after a court dispute with Marysville, and the Arlington and Marysville city limits still meet there. Permits follow whichever city the parcel is actually in, so check the jurisdiction before applying, especially for demolition.

City permits

The city’s permit desk can tell you whether your demolition or remodel permit needs an asbestos survey attached. Whatever the answer, PSCAA’s survey and notice rules still apply, so keep your survey with the permit papers.

Survey, notice and disposal steps

The usual order is survey, notice, removal, disposal. First we sample the materials in the work area, or the whole structure for a demolition. PSCAA needs a notice when 10 linear feet or 48 square feet or more of friable material comes out in a year, and for any demolition of a structure with more than 120 square feet of roof. After a demolition notice, work waits 10 days.

Friable waste needs a shipment record and has to reach an authorized site within 10 days. No facility in Snohomish County qualifies, so we plan the haul to Republic Services in Seattle or Kitsap County’s Olympic View station, both of which take waste from all counties.

Tearing down or replacing an older house

A teardown starts with an AHERA inspector surveying the whole structure, not just the rooms you would have remodeled, and that includes any garage, shed or barn coming down with it. Owners cannot use the self-survey for a demolition, even in their own house. Check at the same time whether Arlington’s demolition permit asks for the survey.

All friable asbestos has to come out before the building is knocked down. Intact nonfriable material, such as vinyl tile or the roofing PSCAA lists as nonfriable, can stay in place during demolition as long as it stays intact. Afterward it goes straight into containers labeled nonfriable asbestos waste.

The demolition notice applies with or without asbestos, and the wrecking can begin only after the 10-day wait. Keep printouts of the notice and the survey on site until the lot is cleared.

Frequently asked questions

Is an asbestos survey required to demolish an old garage?

Yes. Every demolition starts with an accredited inspector looking at the whole structure. If its roof passes 120 square feet, add a notice and a 10-day wait, clean result or not.

Does Arlington have an asbestos drop-off?

No. Asbestos waste cannot go to any landfill or transfer station in Snohomish County, so it has to go to an out-of-county facility that takes it.

Can renters remove asbestos?

No. Only an owner who lives in a single-family house may remove asbestos on their own. Renters, landlords and condo owners have to hire a certified abatement contractor.

Can I survey my own Old Town house before renovating it?

Yes, if you own it, live in it and are renovating rather than demolishing; PSCAA allows a self-survey then. In a house with a century of layered repairs, an accredited inspector’s survey can still be worth it, because it covers materials that are easy to miss.

Does an old barn or shed need a survey before it comes down?

Yes. An AHERA inspector’s survey comes first for any demolition. If the roof covers more than 120 square feet, a demolition notice and a 10-day wait follow, just as for any other structure. A smaller shed skips the notice but not the survey.

Lake cabins and commuter subdivisions are on our asbestos removal in Lake Stevens page. Other services are on our homepage.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.