Asbestos Testing and Remodel Abatement in Marysville

Typical cost in Marysville

  • Testing a few materials, up to about 4 samples$300 – $600+
  • Asbestos survey before a remodel, one house$400 – $1,000+
  • Abatement for one kitchen or bathroom remodel$2,000 – $6,000+

Before a kitchen, bathroom or addition in Marysville gets started, you want to know what is in the walls, floors and ceilings it will open up. We sample those materials and remove whatever tests positive, so the work can go ahead with the results on paper. We work from your drawings or a walk-through: which walls get opened, which floors come up, where the new ductwork runs. Samples go to an accredited lab, and we write up a survey summary your contractors can read.

If you own and live in a single-family house, PSCAA lets you take the owner-occupant route and do the survey yourself. Everything else, rentals and condos included, uses an AHERA building inspector. We do testing in Lake Stevens and Arlington too.

Plan testing for your remodel
Labeled asbestos sample bags and a sampling tool next to a small cut in floor covering

Testing and abatement for remodels

Owner-occupied remodels

If you own and live in a detached house, you can run the renovation survey yourself with PSCAA’s sampling instructions, and buyers may even remove asbestos before they move in. Taking out 48 square feet or more of friable material calls for PSCAA’s single-family notice, which has a $25 fee. PSCAA strongly encourages hiring a certified contractor, and many owners use the survey to decide which parts to hand over.

Rentals, condos and contractor-led work

Landlords, condo owners and anyone renovating a home they do not live in need an AHERA-accredited building inspector to survey before work starts, and a certified abatement contractor to do the removal. Washington law also expects the inspection report to reach contractors before they bid. On these jobs only the inspector can declare a suspect material asbestos-free.

Kitchen and bathroom remodels

These rooms stack materials. A single kitchen can hold vinyl tile under sheet vinyl, adhesive on the backsplash, textured drywall and a sprayed ceiling, each a separate sample. We test every layer in the path of the demolition, so a positive floor does not put the whole room under containment when the walls test clean.

Additions and partial demolition

Taking out a load-bearing wall, a chimney or an attached garage can turn a renovation into a demolition. PSCAA treats demolition differently: an AHERA survey even for owner-occupants, a notice, and a waiting period. Marysville also requires a demolition permit for interior and exterior demolition, so settle this before the design is final.

Marysville permits and PSCAA steps

The city asks for a demolition permit before any interior, exterior or complete demolition. Whether your permit also needs an asbestos survey attached is a question for the Building Department, and it is worth asking early because the answer shapes the schedule.

PSCAA needs a notice once friable removal reaches 10 linear feet of pipe insulation or 48 square feet of anything else in a calendar year, and for every demolition with more than 120 square feet of roof. Certified contractors also send L&I their own notice when a job passes 48 square feet or 10 linear feet. Keep the survey on site and show its summary to every trade that may touch the material.

Positive results often lead to popcorn ceiling removal or floor tile and sheet vinyl removal. The rest of what we do is on our homepage.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (360) 926-9943

Call (360) 926-9943