Asbestos Siding and Roofing Removal in Marysville

Typical cost in Marysville

  • Siding on one wall, garage or shed, about 200 to 400 sq ft$2,500 – $6,500+
  • Siding on a one-story house, about 1,200 to 1,800 sq ft of wall$10,000 – $25,000+
  • Siding on a two-story house, about 2,000 to 3,000 sq ft of wall$16,000 – $40,000+

Old cement shingles come off a house, garage or outbuilding when it is being re-sided, re-roofed or demolished. They are hard and stable while they hang on the wall, but snapping, drilling or power-washing them releases fibers. We wet each course, pull the nails rather than break the boards, and lower them whole.

PSCAA counts cement asbestos products as friable, so siding follows stricter notice and disposal steps than intact roofing, which the agency lists as nonfriable. We take siding and roofing off in Lake Stevens and Arlington too.

Plan your exterior project
Gray cement board shingle siding along an older single-story house

Exterior removal options

Cement asbestos-board siding

These are the flat, rigid, slightly textured shingles that can pass for stone or painted wood from the street. PSCAA has a homeowner guide for removing them from a house you own and live in, and it requires the surface to stay wet throughout.

Asbestos roofing

PSCAA lists asbestos roofing as nonfriable, so intact removal needs no notice, just prompt bagging and a “nonfriable asbestos waste” label on the container. Ordinary asphalt shingles are not on the list of suspect materials. Cement asbestos roof shingles count as cement asbestos products, so they follow the friable rules, like siding.

Siding under newer cladding

Re-siding jobs sometimes went straight over the original shingles. Opening a wall for a window or a new door can reveal that hidden layer, so a sample from behind the vinyl saves a mid-project stop.

Leaving siding in place

Sound cement siding can be painted or covered and left alone, which costs less now. The trade-off is that the material remains, may need to be disclosed when you sell, and still has to be dealt with if the wall is ever opened or the house demolished.

When exterior work needs notices

A notice goes to PSCAA before 48 square feet or more of friable material comes off a structure in a year, and cement siding falls in that group. Intact nonfriable roofing needs no notice unless it is sanded, ground or sawn, which turns it friable. Contractors also notify L&I above 48 square feet.

Tearing down a garage or shed with more than 120 square feet of roof needs an AHERA survey and a demolition notice whatever the siding is made of, then a 10-day wait.

Opening up the exterior can turn up more. See testing and remodel abatement. Interior jobs, from ceilings to ducts, are on our homepage.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (360) 926-9943

Call (360) 926-9943